AMC Job Time Calculator
Works out the Power Scheduler minutes to enter into Printavo.
Checking engine…
Screen Print
Direct to Film
Embroidery
Job
Colour changes
Print delay (flash / dry time)
Location
Screens
Pieces
+ Add location
Clear job
A location only counts when it has both screens and pieces.
Power Scheduler minutes
0
minutes
Copy Power Scheduler minutes
Screen print rates
The figures used to work out these times
›
PLACEHOLDER
not AMC data yet, to be confirmed by production. Changes are saved in this browser.
Reset to defaults
Job
Press staff
Location
Pieces
Width (centimetres)
Height (centimetres)
+ Add location
Clear job
Each location on each piece is one press. A location only counts when pieces, width and height are all filled in.
Printer
0
minutes
Heat press
0
minutes
Copy printer minutes
Copy heat press minutes
Direct to Film rates
The figures used to work out these times
›
PLACEHOLDER
not AMC data yet, to be confirmed by production. Changes are saved in this browser.
Reset to defaults
Job
Machines
Location
Pieces
Stitches
Colours
+ Add location
Clear job
A location only counts when it has both pieces and stitches.
Power Scheduler minutes
0
minutes
0
runs in total on the 8-head machine
Copy Power Scheduler minutes
Embroidery rates
The figures used to work out these times
›
PLACEHOLDER
not AMC data yet, to be confirmed by production. Changes are saved in this browser.
Reset to defaults